I was driving to Valemount last Friday on the Ice fields Parkway. I had heard Parks was closing the road at 10 am for avalanche control, so I left Banff at 7 am. There was over a foot and a half of snow on the road, and a couple of sets of tracks. It took me 5.5 hours for what is usually a 3.5 hour drive.
Be safe out there.
Robert Krysak
No comments:
Post a Comment